|
This GE engine works the
National Gypsum loading facility near Tawas City. Rock is dumped
in this facility to a conveyor system which loads ships 1/3 mile away
out in Lake Huron. This facility is served by the Lake State
Railway. [1996 photograph by Mark Andersen] |