-
January 1: Chicago
& West Michigan, Flint & Pere Marquette, and Detroit, Grand
Rapids & Western are consolidated to form the Pere Marquette RR,
the state's largest railroad system under one management.
General offices are moved from Saginaw to Detroit. [MDOT][PMHS][COHS-8/1997]
-
January 1: Pere Marquette
opens line from Freeport to Belding. [MRRC]
-
Early: The Copper
Range Railroad builds their Painesdale Branch from Painsdale
Jct. (one mile south of the Atlantic Mine station) to Champion
Mine at Painesdale, a length of 4.38 miles. The line passes
through the Baltic Mine, Tri-Mountain Mine, and the Champion
Mine. [CRH]
-
Winter: A Detroit & Mackinac passenger train is delayed
for 10 hours at Lengsville, 13 miles north of Bay City, due to
heavy snowfall. [GW]
-
May 13: Detroit
& Mackinac extended from Onaway to Tower. [NK]
-
June: D&M opens spur to
Tawas Beach Park, operates a tourist and resort business there.
-
July: Link and pin couplers
comes to an end on the Lake Shore & Michigan Southern.
[LS]
-
Summer: Lake Shore shops in
Adrian, present since the road began, are moved to Air Line
Junction near Toledo. This had a serious effect on
unemployment in Adrian. Over half of the men moved to
Toledo to work there. [LS]
-
August 3:
Interurban service
between Kalamazoo and Battle Creek and Gull Lake and Battle
Creek officially begins, although "test" cars have been running
since the first of the year. [MT]
-
August 15: A
head-on collision north of Pierson on the Grand Rapids & Indiana
RR, caused by operator error, killed 8 persons. [MDOT]
-
August: Onaway & North
Michigan Ry. opens 5.5 mile line in and around Onaway, known as
the "Dinky line". Closed in 1930. [MRRC]
-
September 16: The
first electric interurban car arrives in Flint. [EMR4]
-
November: Union
depot in Grand Rapids is opened. [MDOT/IT-4/81/PMHS/AAD]
-
December 1:
D&M opens Harrisville
cutoff.
Discontinues line north of W. Harrisville (Lincoln).
[HI]
-
December 7: T&W
officials ride the first car over the interurban line from
Toledo to the Wabash tracks at Adrian. [EMR4]
-
December 27: The Lake shore
opens their new station in Elkhart, Indiana. The 2nd floor
included the passenger-conductor bunkroom, brakeman's bunkroom,
two rooms for the trainmaster, and the claim agent's office.
[LS]
-
December 28:
Escanaba and Lake Superior opens line from Watson
to Channing. This was the result of an agreement
with the Milwaukee Road for the purpose of hauling iron ore to
the Milwaukee Road docks at Escanaba. This arrangement was
terminated in 1936 when the Milwaukee Road decided to enter a
pooling arrangement with the C&NW rather than undergo the heavy
expense of major improvements to the Escanaba Docks..
[MRRC/EDP-12/27/1950]
-
December 31: Detroit United
Railway consolidates city street car lines. [DWS]
-
December 31: Michigan
Railroad Mileage Totaled 7,946 miles - 12/31/1900 - [MDOT]
-
GTW builds new depot at Haslett
Park (Lake Lansing) - [GTWHS 08/01]
-
Port
Huron Southern completes initial 3 mile line between Port Huron Salt
Company and the Pere Marquette railway junction at Tappan (Port
Huron). [IT-4/81]
-
Carey Hoop Co. builds a private
logging road near Stutsmanville in Emmett County. [MRRC]
-
Houghton County Traction Company
opens street car line between Houghton and Boston Mine. [SSJB]
-
The Copper Range
Railroad erects a coal-unloading hoist on the Portage lake at
West Houghton to provide for large coal tonnage which would be
required by the South Range mines. [CRH]
-
Houghton County Traction Co.
extends street car line to Calumet. Branches are
eventually built to Lake Linden, Hubbell, and Wolverine. [SSJB]
-
The Milwaukee Road builds a
branch line from Kelso Junction to Crystal Falls. [MSL]
-
Empire & South Eastern Railroad
builds 10.7 mile logging ling from Empire to Empire Jct. [MRRC]
-
The Copper Range Railroad begins
building its line between McKeever and Calumet, serving the
South Range mines and mills. [MOD-6/1985]
-
The Copper Range Railroad opens a
four mile branch line between Mill Mine and Painesdale. [CRAR]
-
The Copper Range builds a
roundhouse at Houghton which uses a 60 foot turntable. It holds 10
locomotives. The railroad also builds depots at Houghton and
at Range Jct, which are the largest on the line. The Range
Jct. depot is built in conjunction with the B&NW and Milwaukee
Road [CRH]
-
The Copper Range RR
reaches mines at Elm River, Winona, Wayndot and Belt. [CRH]
-
Michigan Central RR builds a
brick freight house, across from the Ypsilanti depot -
[MRC-09/88]
-
The Pere Marquette relocates it
line in Howell, to west of Walnut Street where a route was cut
through the hill. This location straightened the line.
[COHS-2/1998]
-
Hancock and Calumet Railroad
changes from 3' to standard gauge between Hancock and Keweenaw
Co. [MRRC]
-
The Grand Rapides, Newaygo and
Lake Shore Railroad builds a new wooden depot in Grant.
[MRP-I]
-
The GTW builds a new wood depot
in Lapeer. The depot is stilled used today by Amtrak.
[MRP-I]
-
793 individuals were killed or
injured in railroad related accidents this year. [AAD]
-
Grand Trunk builds depot at
Lapeer and Davison. Depots continue to exist into 1974.
[IT-12/1974]
-
State law now requires trains to
come to a complete stop at railroad grade crossings which are
not protected by an interlocker. [AAD]
-
Alexis, Ohio crossing is finally
converted to a full interlocking. Until this time, all
trains were required to come to a complete stop at this busy
crossing. [EMR4]
-
The Copper Range Railroad
purchases passenger cars from the Pullman Company. [CRH]
-
Almost 100% of railroad track in
the country is made of steel. [STOV]
-
Nationally, there are 193,346
miles of railroad track. [STOV]
-
The D&M builds 82 miles
of logging branches west from the Black River (Tower), west of
Onaway using 50
lb. rail taken from the main line between Bay City and Alpena.
The immediate purpose of these branch lines are for taking out
logs and lumber. Part of this track will be available for
the planned extension of the line to "Cheboygan and Mackinaw,
and in case we build across the country to Petoskey". In
addition, the report notes that the railroad cut down grades
between Alpena and LaRocque during the year. That line was
originally a logging road and has enabled the railroad to add 10
freight cars to the number of cars being hauled in freight
trains. The railroad also plans to lay heavier 70 lb. rail
gradually during the coming year. [DMAR-1900]
-
The D&M begins construction of a
new engine house with 6 stalls and a small shop attached at
Alpena. Also installed is an iron turntable and water
tank. The old yard is also remodeled. [DMAR-1900].