Depression
continues.
-
Railroads collectively operate at
a financial deficit. [STOV]
-
Early: DSS&A builds new ore
dock at Marquette. [SOO-Fall/1994]
-
May 21: Houghton County
Street Railway Co. ceases operations. [SSJB]
-
June 11: Detroit,
Toledo & Milwaukee RR is abandoned between Dundee and a
junction with the Battle Creek & Sturgis Ry. at Morgan Park
(Emmet Township). [MDY33]
-
August 5: Pere
Marquette RR suspends river ferry service in Port Huron (resumes
in 1950's). [PMHS]
-
August 26: The
I.C.C. approves the abandonment of the Detroit and Charlevoix
Railroad. [MDOT]
-
September 17: The
DT&I discontinues all passenger service in Michigan, leaving
only passenger service between Springfield and Jackson, Ohio
[EMR4]
September 23:
Canada Southern Ry. abandons the St. Clair & Western Railroad
between St. Clair and Ridgeway. [MRRC]
October 5: The last car is
operated on the Detroit to Toledo interurban line. [EMR4]
November 2: A bitter and
contentious strike ends streetcar service in Kalamazoo.
[MT]
-
Pere
Marquette RR abandons line between White Cloud to Big Rapids. [PMHS]
-
Pere
Marquette RR abandons line between Fostoria and Otter Lake. 5.15
miles. [PMHS/COHS-8/1997]
-
Manistee
& North Eastern begins operations over portions of PM track,
abandoning its own parallel tracks from Kaleva to Traverse City. [PMHS][PM45]
-
Pere Marquette abandons line from
Grindstone City to Port Austin, 5.2 miles.
[COHS-8/1997]
-
The Rochester MC/DUR crossing
tower is closed. Also known as Main Street, 3 MC and 3 DUR
tracks crossed directly over the roadway of Main Street. [CW]
-
Operation of the LS&MS Lansing
Branch is transferred to the MCRR Michigan Division for
operating purposes. Service between Lansing and Jonesville
is provided by mixed trains #64 and #65. [MRC-5/1981]
-
Most PM main line wooden
passenger coaches are replaced by all-steel equipment.
[COHS-2/1998]