-
January 8: Sister Ann
Joachim, 79, died at the Dominican Mother House in Adrian.
Sister Ann was also a lawyer, and opposed before the I.C.C. in
1969 the discontinuance of Norfolk and Western's St. Louis to
Detroit "Wabash Cannon Ball". The famous train continued
in service until making its last run on April 30, 1971 - one day
before thestart up of Amtrak. [MRC-3/1981]
-
January 15: Ludington
& Northern stops operating after C&O raises rates. [IT-10/81]
-
March 1: Conrail
scheduled to close the Porter (Indiana) Tower, at the junction
of the Lake Shore route with the Michigan Central route to
Chicago. [MRC-2/1984]
-
April: Chessie Mt.
Pleasant subdivisioin is abandoned and the rail removed, 14.7
miles. Chessie secures trackage rights on the Ann Arbor
Railroad between Clare and Mt. Pleasant to service Mt. Pleasant
customers. [IT-5/81]
-
April: The
ICC approves a request from the CNW to abandon 52.9 miles of track
between Monico, WI to Watersmeet, MI. Watersmeet continues to
be served by CNW from two other directions. [IT-4/81]
-
April: Chessie closes the
Wyoming roundhouse near Grand Rapids. [IT-5/81]
-
May: Chessie
abandons Remus branch, 15.7 miles north out of Edmore.
[IT-5/81]
-
May: Chessie files to abandon
26.8 miles of the Ionia Branch from Grand Ledge to Ionia.
Closed within the next three years. [IT-5/81]
-
July 16: Detroit
Terminal RR becomes a part of Conrail. [IT-4/81]
-
July 16: Detroit
Terminal's Davison Yard closed. [IT-4/81]
-
October 1: Grand
Trunk Western acquires the Detroit & Toledo Shore Line RR. [MDOT]
-
November 18: Nichols
Tower in Battle Creek is closed. It was a Conrail structure. [IT-12/81]
-
November 18: Conrail
and GTW lines in downtown Battle Creek are consolidated onto the GTW
rails. The Conrail tracks are removed.
[IT-12/81]
-
November 19: N&W
Maumee River Bridge in Toledo, OH was strengthened to handle 6-axle
locomotives. [IT-12/81]
-
November: Battle Creek
opens new intermodal rail-bus-cab station. [IT-5/81]
-
November: D&M
resumes operations between Cheboygan and Big Cut for 30 days,
then
stops. [IT-12/81]
-
December 21: Chessie System
runs its last train to Hart.
The rails are pulled up
north of Montogue on May 13, 1982. [MRC-6/1986]
-
December: Amtrak
Depot opens in Battle Creek. [IT-10/81]
-
Late: Soo Line 49
mile rail line from Hancock to Nestoria is approved for
abandonment by the ICC. [IT-5/81]
-
Late: Conrail closes
Airline Yard. [IT-5/81]
-
-
GTW Bancroft depot is destroyed
by fire. [IT-5/81]
-
The Escanaba & Lake Superior
purchases the former MILW Republic line. [ELSW]
-
Ludington's
CSX turntable is removed and scrapped. [IT-10/81]
-
State
purchases trackage from Grawn through Traverse City to Williamsburg,
as well as 16.4 miles from Charlevoix to Bayview for $1.7 million,
to be operated by the Michigan Northern.
Charlevoix to Lanson
is being railbanked. [IT-12/81]
-
Chessie
System abandons the Hart Subdivision. (delayed?) [IT-12/81]
-
Conrail's
MCRR Belt Line on Detroit's east side is now embargoed south of
Gratiot Avenue, including the Detroit Transit RR. [IT-12/81]
-
Detroit
Terminal RR trackage west of old Davison yard is abandoned.
[IT-12/81]
-
Old
Detroit Terminal RR roundhouse at Davison yard is removed.
[IT-12/81]
-
Soo Line drops passenger service
on mixed trains in the Upper Peninsula. [IT-1/82]
-
Soo
Line 49-mile line from Hancock to Nestoria has been authorized for
abandoment by the ICC (Note: stayed open from Baraga to Nestoria). [IT-2/82]
-
Airline
Yard in Toledo is closed. [IT-2/82]
-
Cadillac and Lake City
Railway abandons branch from Penn Central to Lake City.
Ceased operation in 1975. [MRRC]