January 23: Huron
& Eastern Ry. takes over operation of the original 54 miles of
TSBY operation near Vasser. [AATHA-Sp/1991]
-
April: Work crews
remove rail and ties of the former MCRR/NYC/D&M line between
Cheboygan and Mackinaw City. [MRC-8/1991]
-
April: Railroads begin
blowing their horns at all road grade crossing in cities where
it was formerly prohibited by local ordinance. This
follows a study from the FRA indicating that grade crossing
accidents increase 195% when the horn is not used. The FRA
also ruled that local ordinances are superceded by federal law.
[MRC-12/1991]
-
June 1: CSX closes Plaster
Creek (JG) Tower in Grand Rapids, transferring operations to
Jacksonville, Florida. Plaster Creek controlled trains
entering or leaving Wyoming yard, and the entire main line
from the old Pleasant Street Tower to just past the East Tower
at Lamar. As of this writing the following towers remained
on the CSX in Michigan and the region: Alexis, Carleton,
Delray, Rougemere, Fostoria, Hallet, Plymouth, Ironville
(Presque Isle), Manhattan Blvd., Millard, RX in Toledo,
Walbridge WR, and Walbridge Stanley. [C&OHS-4/1991]
-
August 11: Milan Tower
closes. [MRC-9/1991]
-
September 21: Amtrak
completes a $1.7 million renovation of the former CSX Holland
Depot. [MRC-12/1991]
-
-
The Wisconsin Central awards
contracts to strengthen the international railroad bridge at
Sault Ste. Marie. [MRC-9/1991]
-
All tank cars in hazardous
materials service must be equipped with journal roller bearings
and may not be equipped with plain bearings. [SAM]
-
Detroit
& Mackinac removes all rail between Hawks and Cheboygan.
[NK]
-
The N&W files to abandon its
Delta District from Delmont Jct. (Maumee, Ohio) west to
Montpelier, Ohio, about 48 miles. There has been no
through train on the lince since December, 1990.
[MRC-8/1991]
-
The former GR&I/PRR/Northern
Michigan track from Reed City north to Cadillac has been pulled
up. [MRC-8/1991]
|
|