RRHX

Timetable:  GTW Saginaw Subdivision

Michigan's Internet Railroad History Museum

 

 

 

 

 

NYC Main Page

Timetable Menu

RRHX Home

MichiganRailroads.com

----------

 

 

 Stations

 MP

 Open

 Track/Siding

 Notes

 

 

1967

 

 

 Junction with Grand Haven Sub

 

 

 

 

 

 

 

 

 

 Durand

     Jct. with Grand Haven Sub

     Crossing of the Flint Sub

     Connection with the Holly Sub

0.0

24 Hours

 

 

 Lennon

6.3

Days M-F

1,620

 

 Flushing

12.9

Days M-F

900

 

 Brent Creek

16.8

 

1,325 - 567

 

 Montrose

20.8

 

1,900 - 250

 

 Burt

25.4

 

1,310

 

 C&O Crossing

     Crossing with Pere Marquette

36.0

 

 

 

 Saginaw Freight Yard

37.5

 

 

 

 Brady Hill

     Crossing of the Pere Marquette

37.8

 

 

 

 Merideth St.

     Junction with the Michigan Central

39.0

 

 

 

 MX Tower

     Crossing of the Michigan Central

39.2

Days M-F

 

 

 MCRR Saginaw River Drawbridge

 

 

 

 

 MCRR Saginaw Depot (W.S.)

 

 

 

In the 1940's, the GTW and New York Central combined operations from Meredith St. in East Saginaw, over the NYC bridge, to Bay City West Side.  Some of the GTW line remained near Mershon to serve industry.  The GTW Saginaw River Drawbridge in Saginaw was removed.

 Mershon

     Crossing of the Pere Marquette

40.8

 

 

 Zilwaukee

44.6

 

 

 Salzburg

 

 

 

 Main Street

     Crossing of the Michigan Central Bay City Branch

50.7

 

 

 

 Bay City

53.2

 

 

 Passenger station on east side of river via bridge.

 Bay City Freight House

 

 

 

 Bay City Shops

 Center Street

     Crossing of the MC Mackinaw Branch

 

 

 

 

 D&M Jct.

     Jct. with the D&M

 

 

 

 

         
Key: Single Track:   Double Track:  

Top of page.