Print

Timetable: Wabash Railroad - Main Line 1st District - Toledo to Montpelier

The 1st District of the Wabash Railroad extended from Toledo to Montpelier. Siding length as of 1941.

Station MP from Toledo Notes
Toledo  0.0 Yard
Toledo Yard  1.3  Yard 
Walbridge Junction xNKP 3.3 
Gould xTT 5.3   
Wanick Junction xWAB 8.6   
Maumee  9.2   
Monclova  12.6   
Midway  17.2   
Brailey  22.2   
Delta  26.3   
Delta Yard  29.4  Yard P112 
Wauseon xNYC xDTI 33.7  I I P66
Eckley  39.4   
Elmira  42.5   P54
West Unity xB4 49.1  I P52
Montpelier  58.3 
     

Notes:

In 1941, this line was CTC and block signals from Walbridge Junction to Wanick Junction.

Note Key: BB=Bascule Bridge | C=Coal | CS=Car Shop | D=Open > Day | DN=Open Day and night | DS=Dispatcher | DT=Double Main Track | EH=Enginehouse | F=Diesel Fuel | HI=Half Interlocked Crossing | I=Interlocked Crossing | J=Junction | LB=Liftbridge | N=Open at night | P=Passing Track w/40' car capacity | Q=Quarry | RH=Roundhouse # stalls | RT=Railroad Resort | S=Scales | SB=Swingbridge | T=Turntable | TC=Telegraph call | W=Water | X=Crossing | Y=Wye | Yard=Yard

[REF] = XXXXXX plus additions.