Began → Beaufort Mine → Became
Operated for:
From: 1885
Owned by: Rhoney & McEneroe. Then leased to Oglebay, Norton & Co. of Cleveland, OH
Produced: Iron Ore
Method: Underground shaft.
Railroad connection: DSS&A
Stamp Mill/Pellet Plant:
Until: 1908
Lifetime Production: 354,654
In Baraga County.
Shared same body of ore with Titan Mine. [SOO-2011-Sum]
| Year | Tons |
| 1885 | 15,964 |
| 1888 | Idled |
| 1900 | Activated |
1882. A 2.7 mile spur is built to this mine from the MH&O. [DSS]
1885. 6,003 tons shipped through L'Anse and 9961 via Marquette. After 1885, all rock shipped via Marquette. [SOO-2011-Sum]
1885. Mining commissioner reports 60 men are employed, 45 in the mine. Raising 140 tons of ore daily. [SOO-2011-Sum]
1900. New lease to Oglebay, Norton & Co. of Cleveland, OH. They transferred the operation to the Bristol Mining Co. The mine is in excellent condition. The machinery was overhauled and improved, buildings repaired, new trestles, shaft houses were reconstructed. Underground working are put in first-class shape. But the pups are to be taken from underground and the workings allowed to fill with water. It will be cheaper to let the mine fill than to keep men employed looking after the boilers and pumps during the winter season. When ready to work, the mine can be pumped out within a few days. [SOO-2011-Sum]
1908. Idle in 1908.