Began → Pittsburgh & Lake Superior Mine → Became
Operated for:
From: 1874
Owned by:
Produced: Iron Ore
Method:
Railroad connection:
Stamp Mill/Pellet Plant:
Until:
Lifetime Production: 24,000 tons of ore shipped in 1872-1874.
Adjoins the Palmer Mine. Mining suspended from 1875 to 1877.