Palmer Line Junction is the north leg of the wye connecting the C&NW line from Escanaba with the joint line to Hogan Ore Yard or Eagle Mills. It is controlled by the control operator at Eagle Mills.
The following sources are utilized in this website. [SOURCE-YEAR-MMDD-PG]: