Lansing, MI - GTW Coal facility
The Grand Trunk Western built this massive main line coal loader in the 20's or 30's between Lansing and Trowbridge (East Lansing). The facility was capable of loading four locomotives simultaneously on four tracks. Loaded coal cars were brought under the portal at the left for loading into conveyers to take it to the massive bin above. This facility still exists today, though abandoned. Two tracks still bring trains underneath and the side track is used for coal storage to a nearby municipal power plant.
Photo info/credit: [Dale Berry]
Bibliography
The following sources are utilized in this website. [SOURCE-YEAR-MMDD-PG]:
- [AAB| = All Aboard!, by Willis Dunbar, Eerdmans Publishing, Grand Rapids ©1969.
- [AAN] = Alpena Argus newspaper.
- [AARQJ] = American Association of Railroads Quiz Jr. pamphlet. © 1956
- [AATHA] = Ann Arbor Railroad Technical and Historical Association newsletter "The Double A"
- [AB] = Information provided at Michigan History Conference from Andrew Bailey, Port Huron, MI